
- Client
- Water Resources Department, Government Of Madhya Pradesh (MKPMU)
- Industry
- Public Infrastructure · Irrigation
- Timeline
- 2026 · Ongoing
- Services
- Website Design & Build · UX & IA · Content Strategy
Client & project overview
Two dams, one command area, 2,87,628 ha.
The Mohanpura-Kundalia Project Management Unit (MKPMU) sits under the Water Resources Department, Government of Madhya Pradesh. The project itself pairs two dams — Mohanpura in Rajgarh district and Kundalia in Agar-Malwa district — delivering water through a pressurised, underground pipe network rather than open canals.
It's part of the wider Parvati-Kalisindh-Chambal (PKC) link, but the site's job is to represent this project on its own terms: its own command area, its own two districts, its own timeline — not the province-wide PKC figures it's sometimes bundled with in older materials.
What Vistaar built & delivered
Build for verification, not just presentation.
One source of truth
Every figure cross-checked across the Best Practices report, FAO overview and PD-approved presentations, under a standing data-freeze protocol before anything publishes.
A page-router SPA
16 pages on a single component-driven page router, so a scope correction or a timeline update is a scoped fix — not a rebuild risk.
Built for the field, not the desk
A hamburger drawer, mobile-first layouts and a lightweight blog-article system, since much of the audience is checking project status from a village, not an office.
Services involved
- Admin panel architecture
- Role-based UX design
- Verification workflow design
- Dispute resolution system
- Subscription & credit pricing engine
- Feature flag infrastructure
- Audit logging
- Support & FAQ CMS
Website, brand & UI design
A Visual Language Built On The Product Itself.

Featured creatives
Campaign Direction.
Outreach & storytelling
100 Days, 100 Villages.
A card-based content segment and a full blog-article system, built to carry the project's on-ground story beyond the engineering figures.
Before & After
From Scattered Decks To One Verified Source.
Project Data
BeforeScattered across PDFs, decks and reports — inconsistent figures
AfterVerified figures cross-checked against source documents, published on one canonical portal
Geographic Scope
BeforeEscalated verbally between ops, sales and admin, no formal record
AfterCorrectly scoped to Mohanpura-Kundalia's 2 districts, 2,87,628 ha command area
Public Presence
BeforeNo public portal — internal review decks only
After16-page responsive SPA, live with a page-router architecture
Field Storytelling
BeforeNo outreach content for on-ground programmes
After100 Days 100 Villages card content, plus a six-article blog system with a slide-in reader
Outcome
A Published Portal Not Just A Design File.
- 16-page responsive SPA designed, built and shipped on a single page-router
- Mobile-first layouts with a hamburger/slide-in drawer, tested across breakpoints
- Blog article modal system live with six full-length articles
- Standing data-verification protocol established with the Project Director's office for every published figure
A complex government project with lots of information, and they made it structured and easy to navigate. Communication and delivery stayed smooth throughout.






